Power Construction will be managing the upcoming Terminal 5 Landside Improvements and Repurposing (Stage II) O’Hare International Airport – Phase 1 project.
Join us for a virtual presentation to discuss: SCOPE OF WORK: • Multilevel expansion of Terminal 5 along the curbside of the upper-level roadway • New pedestrian bridge connecting the headhouse to the parking garage over terminal roadways ADDITIONAL PROJECT DETAILS: • +50,000 square feet of new building space, including a pedestrian bridge and mezzanine floor • Installation of new passenger elevators and escalators to enhance accessibility • Designed to improve passenger experience by expanding circulation space and streamlining flow between Terminal 5 and the new parking garage TIMING • Anticipated construction start: Q4 2025 • Anticipated completion: Q2 2028 • Procurement: 75% drawing set expected to be issued for bid on 6/18 Project opportunities include, but are not limited to, the following scopes: • Building enclosure work • Exterior and interior finishes • Mechanical, electrical and plumbing • Paving and landscaping • Site preparation and earthwork • Structural and concrete work
|
|
|